Milestone 0 & 1 DS1 — 2021/11/01
- Milestone 0 completed
- Milestone 1 pre-DS individuals were all completed and combined for finalized stage 1 requirements
- Stage 2 & 3 completed in class
- Stage 4 discussed and it was agreed that we would finish adding individual sketches by 11 AM next day to allow for review and submission time by admin.
- Individual sketches added and Milestone 1 completed + submitted 2021/11/02

Figure 1. Sample Individual Sketch of Suggested Container Mobility Features.
Notes from Lab 8B (Activity 2B)
- Completed Activity 2B
- For modelling, important to note that the gripper pads are rectangular
Milestone 2 DS2 — 2021/11/08
- Completed pre-design studio
- Created both low-fidelity prototypes
- Able to use materials in class to "test" the integrity of each object for discussion
- Pictures and prototype notes to be added for document submission on 2021/11/09

Figure 2. Sample Low-fidelity Prototype of Container, Displaying Carriage and Tool Security Features.
TA Meeting
- 5 min 15 sec duration, full attendance
- Recap of previous work
- All pre-DS work completed
- P2 Design Summary document may be updated in the near future
- Going over refined sketches and flowcharts
- Modelling team to do the low fidelity prototype
- Computing team to work on pseudocode
- Similar to a procedure/recipe